Previous Index Page Next

40,000 SF concrete tilt up building for aircraft machining and fabrication facility.

Over 740 cubic yards of concrete pour completed in one day using the latest in laser screed technology supplying a close tolerance level slab.

Eight inch thick 4500 psi slab is designed for aircraft machining equipment stress and weights 32’ high panels with 26’ clear below allowing for specialized equipment clearances.


10,000 SF interior storage mezzanine with corporate offices and testing lab located below.

Building is equipped with sprinklers and 2000 volts of 480 power.

 
Previous Index Page Next

Arden Engineering,
Orange, CA